MS75089D
TABLE II. Electrical characteristics (final).
Inspection group |
Allowable variation from Initial measurement |
Allowable percent from specified minimum value in electrical characteristics (initial) table |
||
Inductance (percent) |
DC resistance |
Self-resonant frequency |
Q |
|
Qualification inspection Group II Group III Group IV |
±5 ±10 ±5 |
--- ±(5% +.001 ohm) ±(2% +.001 ohm) |
--- -15 -5 |
-10 -20 -20 |
Conformance inspection group C Subgroup I Subgroup II Subgroup III |
±5 ±5 ±10 |
--- ±(2% +.001 ohm) ±(4% +.001 ohm) |
--- -5 -15 |
-10 -20 -20 |
Application notes:
1. After the overload test is performed, a period of 24 hours shall elapse prior to taking electrical characteristics
(final) measurements.
2. DC resistance shall be the last measurement taken in the electrical characteristics test sequence.
Changes from previous issue. The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue.
Referenced documents. MIL-PRF-15305
MIL-STD-202
Custodians: Preparing activity: Army - CR DLA - CC
Navy - EC
Air Force - 11
DLA - CC Project 5950-2007-041
Review activities:
Army - AR, CR4, MI Navy - AS, MC, OS, SH Air Force - 19
NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https://assist.daps.dla.mil.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business